New Zealand development cost guide

How Much Does Architectural Design Cost in New Zealand?

Understand concept design, RC drawings, BC documentation and construction-stage services before comparing fees.

Reviewed 6 November 2026
3D illustration of a townhouse and architectural plans
Prepared by Buildara NZ

Editorial method: public sources and their limitations are listed in this guide. Provider prices, historical examples and Buildara assumptions are identified separately. Obtain a current project-specific quote.

Illustration: AI-generated; not a surveyed site or project design.

Compare service stages, not just the feeConcept sketches, resource consent drawings, building consent documents and construction-phase services have different purposes. A quote for one stage should not be treated as the price of a complete architectural service.

Architectural design fees in New Zealand are agreed for the project and scope. A small alteration, a bespoke house and a multi-unit development need different inputs. There is no universal percentage or per-square-metre rate that establishes what your project should cost.

Published architectural design fee examples

Service and scopePublished NZD reference
Simple renovation architectural service — CA ArchitectureFrom $2,500 + GST
Feasibility — Ibex default estimator example*$500 + GST
Concept, including up to 3 variations — same Ibex example*$2,100 + GST
Senior architectural designer / LBP time — CADViz advertised starting rateFrom $110/hour + GST
Concept-to-RC drawings, BC documentation or multi-unit developmentProject-specific staged quote
Tender assistance, contract administration and construction observationConfirm separate service and fee

Sources checked 6 November 2026. These are individual providers’ advertised examples, not national averages or comparable packages. *Ibex’s displayed default example is a “Large” new-build project, single storey, up to two claddings, with 150 m² shown; the feasibility and concept amounts are stage examples, not the complete design fee. Confirm the estimator settings and a written quote. All numeric prices above exclude GST. Specialist and authority charges need separate confirmation.

Percentage fees: agree the base and the service

CA Architecture publishes a broad 2–10% range depending on project and service. It illustrates a 5% fee on $900,000 of construction excluding GST as $45,000 + GST. This is one provider’s explanation, not an industry tariff. Confirm the applicable percentage, construction-value definition, excluded costs and GST treatment in your engagement.

A lower percentage applied to a wider cost base can produce a higher fee. Ask whether the fee changes when the construction estimate changes, which stages it buys, and whether consultant coordination includes the consultants’ own charges.

What does the building designer do?

Brief and feasibility

Discusses the intended use, space needs, site information and budget. Identifies design constraints with the planner and specialists, and defines what will be investigated before committing to detailed work.

Concept and developed design

Explores the arrangement of buildings and rooms, orientation, circulation, form and material direction. Refines the selected option against the brief, site and budget.

Consent and technical documentation

Prepares agreed architectural drawings and specifications for the relevant stage, coordinating technical input. Confirm applications, further-information responses and design revisions separately.

Tender and construction services

If appointed, helps obtain comparable contractor prices, administer the construction contract, answer design queries and observe agreed aspects of the work. These services are not automatically included in a consent-only fee.

The stages and their deliverables

  1. Predesign: brief, available title and site information, constraints, consultant responsibilities and an initial budget strategy.
  2. Concept: agreed layout options, massing or elevations and enough information to choose a direction; confirm whether 3D views are included.
  3. RC documentation, where required: drawings showing the proposed development for planning assessment, coordinated with the planner and relevant reports.
  4. Developed and detailed design: resolve the agreed building systems, dimensions, materials and junctions with specialist input.
  5. BC documentation, where required: architectural plans and specifications supporting Building Code assessment, with relevant engineering and compliance information.
  6. Pricing and procurement: agree the schedules, details and tender assistance needed for comparable contractor offers.
  7. Construction and completion: agree query responses, site observations, contract administration, changes and handover support.

These are scope checkpoints, not a mandatory sequence for every job. Stages may overlap or be bundled. RC approval does not replace BC approval, and neither a concept nor an RC drawing set should be assumed to be a complete construction or tender package. Confirm the drawing purpose and remaining work in writing.

Architectural designer, architect or draughtsperson?

Check the person’s qualifications, relevant project experience and service scope. A registered architect and an architectural designer are different professional descriptions; the title alone does not establish the deliverables, fee or suitability for your project.

MBIE advises checking the appropriate registration or design licence. Where residential restricted building work is involved, the design needs to be done or supervised by an appropriately licensed practitioner, subject to applicable exemptions. Registered architects are deemed licensed in the design class. Confirm who is responsible for the relevant design and documentation.

How the designer works with other consultants

For multi-unit housing, ask whether the fee covers the entire site, each dwelling type, repeated units, site-specific adaptations and shared elements. Repeating a floor plan does not remove the need to coordinate levels, structure, drainage and unit interfaces.

How fees are charged

Fixed or staged fee

Agree named deliverables, design options, revisions and the end point. An estimate is not a cap unless expressly agreed. Confirm what triggers a variation.

Percentage or hourly fee

Agree the cost base or staff rates, GST, estimated hours and reporting. Ask how scope changes, redesign and additional coordination will be authorised and billed.

Keep the construction budget under review

Set both a construction budget and an overall project budget at the outset. Agree when a builder or quantity surveyor will check the design cost before it is developed further. Drawings alone do not establish a contractor’s price, and reducing the scope after detailed documentation can create redesign costs.

What may be excluded?

Ask who may use the drawings and what files will be supplied if the project is paused or transferred. Construction observation is an agreed review service; it should not be assumed to mean continuous supervision or replacement of the builder’s responsibilities.

Using Buildara’s calculators

The Building Cost Calculator offers architectural allowances of 4%, 7%, 10% and 14% under its Architect / designer options. These are model assumptions, not verified rates for particular professional titles. In its current Professional Detail calculation, the architectural percentage applies to the base construction cost; your consultant may use a different cost base and scope. Check the calculation basis and GST setting before comparing.

In the Project Margin Calculator, account for the design quote once in your overall cost plan. If allocated to Professional fees per lot, include it within the total subdivision allowance and consistently apportion any whole-project fee. The breakdown is part of the total. Check whether a design-and-build contract already includes architectural fees before adding them separately.

Related guides: Planner and AEE costs · Survey · Civil engineering · Geotechnical · Traffic · Landscape design.

Before accepting a design proposal

  1. Which stages, plans, specifications and applications are included?
  2. How many options, revisions and information-response rounds are allowed?
  3. Who coordinates the consultants, and whose fees are additional?
  4. What is the percentage cost base, fixed-fee scope or hourly rate schedule?
  5. When will construction pricing be checked, and how is redesign charged?
  6. Are tendering, site visits, contract administration and completion included?
  7. What are the payment milestones, GST basis, file deliverables and drawing-use terms?

Sources and limitations

For preliminary budgeting and scope comparison only. Public examples may change and do not confirm project suitability or approval. Obtain a written proposal from a suitably qualified design professional.

Common questions

Do architectural fees include every consultant and council charge?

Not automatically. Confirm consultant fees, coordination charges and authority costs separately.

Can RC drawings be used directly for construction?

Do not assume so. Confirm the remaining detailed design, applicable building consent approval, specifications and construction details.

Is a lower percentage fee always cheaper?

No. Compare the cost base, service stages and exclusions as well as the percentage.

Estimate the wider project budget

Bring design fees, approvals and construction into the same project budget.