There is no single national traffic design fee. A small access review can require much less work than an integrated transport assessment or detailed intersection design. The figures below are published planning-guide references, not verified quotations from traffic engineers or a NZ-wide fee survey.
Indicative assessment fees and design scope
| Service and scope | Published NZD reference |
|---|---|
| Traffic statement for a small residential proposal (Planr) | $1,500–$3,000 + GST |
| Traffic impact assessment / TIA (Planr) | $3,000–$8,000 + GST |
| Integrated transport assessment with counts and intersection modelling (Planr) | $10,000–$30,000+ + GST |
| Basic TIA — older Planning Plus example | From $3,500 + GST* |
| Parking layout, swept paths or vehicle crossing design | Scoped quotation |
| Detailed intersection / road design, audits or hearings | Specialist quotation |
| Temporary traffic management plan and site implementation | Separate scoped quotation |
Sources checked 6 November 2026. Planr’s figures are a planning provider’s indicative allowances. *Planning Plus’s article is older and its starting figure is historical context, not a verified 2026 price. All numeric examples above exclude GST. Confirm the actual scope, date and GST basis in a current written quote; assessment fees do not establish the price of detailed construction design.
Which traffic service do you need?
Feasibility and access review
Early advice can identify access, visibility, circulation or parking constraints before the site layout is fixed. Ask whether a short written opinion or a consent-ready assessment is required.
TIA / transport assessment
Assesses the development’s transport effects. Depending on scope, this may examine trips, site access, parking, loading, manoeuvring and proposed mitigation.
Integrated transport assessment
For proposals needing a wider assessment, agree the geographic extent, transport modes, surveys and modelling with the relevant authority. Terminology and thresholds vary by council.
Detailed traffic design
May cover access geometry, parking layouts, swept paths, crossings, intersections, signs or markings. Agree the drawing stage, civil engineering interface and approval responsibilities.
What makes the fee increase?
- More dwellings, commercial activity, freight or complex peak-hour movements
- New traffic counts, intersection modelling or multiple layout options
- Busy roads, constrained visibility, nearby intersections or safety concerns
- Walking, cycling, public transport and accessibility investigations
- Authority consultation, additional information requests, redesign or hearings
Assessment, design and implementation are separate stages
An assessment may recommend a new crossing, altered driveway or intersection treatment. Ask whether developing that solution into approved construction drawings is included. Surveys, drainage design, utility relocation, pavement design and roadworks may require other consultants and contractors.
Auckland Transport publishes Auckland-specific ITA guidance and encourages early engagement. Confirm local requirements with the relevant council and road controlling authority; the name of a report alone does not define its scope.
Temporary traffic management is a separate budget
A TMP concerns managing road users while work occurs. Its design or submission fee does not cover crews, signs, barriers, equipment hire, road occupancy or repeated site attendance. Keep it separate from a permanent development traffic assessment and from the contractor’s works.
What should a quote include?
- The report or drawing stage, assessment area and agreed site layout
- Counts, survey data, modelling and swept-path checks, where required
- Meetings, authority responses and the number of revisions
- Detailed design, peer review or safety audits, if commissioned
- Exclusions, extra-work rates, travel, disbursements and GST
Use the Buildara calculators
The Building Cost Calculator currently has no dedicated traffic consultant fee field. Check whether a quoted design package already includes it and account separately for any missing fee.
For development feasibility, the Project Margin Calculator lets you record Professional fees per lot within the total subdivision allowance. Use the ex-GST basis and consistently convert whole-project fees to per-lot amounts. Its fee breakdown is part of the subdivision total; do not add the same fee again. Budget roadworks and temporary traffic management separately.
Related guides: Civil engineering costs · Survey costs · Landscape design costs.
Next stage: EPA engineering plan approval — design, traffic input and costs.
Sources and limitations
- Planr — Traffic assessment scope and indicative fees
- Planning Plus — Older resource consent cost guide
- Arrive — TIA, ITA and feasibility services
- Auckland Transport — Integrated Transport Assessment guidelines
For preliminary budgeting only. Published assessment allowances do not guarantee approval or define your project’s requirements. Obtain a current project-specific quote from an appropriately experienced transport professional.
Common questions
How much does traffic design cost in New Zealand?
Planr publishes indicative allowances of NZ$1,500–$3,000 plus GST for a traffic statement and NZ$3,000–$8,000 plus GST for a TIA. These are planning-guide references, not a national fee schedule; detailed design needs a scoped quote.
Does a TIA include road construction drawings or a TMP?
Not automatically. Confirm detailed design, approval support, temporary traffic management and physical works separately.