New Zealand has no single national tariff for private planning consultants. The fee depends on the proposal, planning issues, specialist input and how far the engagement extends beyond preparing the report. A fee to write an AEE is not automatically a fee to manage the application through a decision.
Published planner fee references
| Service and scope | Published NZD reference |
|---|---|
| Simple residential land-use consent preparation — Planr indicative guide | $1,500–$4,000 + GST |
| More complex land-use consent — Planr indicative guide | $3,500–$6,500 + GST |
| Subdivision consent planning — Planr indicative guide | $5,000–$10,000+ + GST |
| Low to mid-complexity AEE and related planning work — older Planning Plus example | $3,500–$6,500 + GST* |
| Feasibility / planning due diligence only | Agree deliverables and quote |
| Extra revisions, further-information responses or post-consent work | Confirm inclusions / hourly rates |
| Notification, hearing, mediation or appeal support | Separate staged quotation |
Sources checked 6 November 2026. Planr’s figures are its published indicative guide, not a national fee survey or a quote for your property. *Planning Plus’s article is older; its AEE example is historical context, not a verified 2026 rate. The packages may cover different tasks. All numeric references above exclude GST and exclude council charges and other consultants unless expressly included. Confirm the current scope and price in writing.
What does a planner actually do?
1. Planning feasibility and rule check
Reviews the proposal against relevant planning provisions, zoning, overlays and site constraints. Identifies likely consent requirements, unresolved issues and the specialist information needed before the design is fixed.
2. Advice to the design team
Discusses planning implications of layout, height, setbacks, earthworks and other project features with the designer and relevant specialists. Helps compare options; does not replace architectural or engineering design.
3. AEE and application preparation
Prepares the Assessment of Environmental Effects and the planning assessment within the agreed scope. Describes the proposal and effects, draws on specialist reports and assembles the application documents.
4. Application coordination
Where commissioned, lodges the application, tracks correspondence and coordinates responses, revised documents and draft-condition discussions. Confirm whether this service ends at lodgement or continues to a decision.
Before lodging: the work behind the report
- Review the current proposal, available site information and relevant planning rules.
- Identify which approvals and specialist reports may be needed and clarify their scope.
- Advise whether pre-application discussion would help resolve a material issue.
- Coordinate the planning narrative with the latest architectural, survey and engineering documents.
- Assess relevant effects and mitigation, and address consultation or written approvals where appropriate.
- Check that the submitted plans and reports describe the same proposal.
AEE means Assessment of Environmental Effects. It is the application’s account of the proposal’s relevant effects and how they are addressed. The level of analysis should suit the project; commissioning every possible specialist report is not a substitute for identifying what the application actually needs.
After lodging: define the remaining service
The authority may ask for further information, often referred to as an RFI or section 92 request. The planner may coordinate the response, but revised drawings or technical calculations still need the responsible designer or specialist. Ask whether the quote includes a specified number of response rounds or charges all post-lodgement time separately.
If engaged, the planner can also help you understand proposed conditions and the remaining planning steps. Notification, submissions, hearings, legal advice, appeals and post-consent changes can require materially more work and separate appointments. Neither a private planner nor pre-application advice guarantees consent.
How planners charge
Fixed fee for a defined scope
The price applies to named deliverables and assumptions. Check the number of meetings, layout versions and response rounds. Work outside that scope can still be charged separately.
Hourly fee or staged estimate
The charge follows actual time at agreed staff rates. Ask for an estimated range, budget reporting and a written instruction before material extra work. An estimate is not a guaranteed cap unless the engagement says so.
There is no verified private-consultant hourly benchmark on this page. Ask for the proposed planner’s rate schedule, GST basis, expected hours, billing increments and disbursements. Council officer rates and hearing commissioner rates pay for different roles and should not be presented as your consultant’s fee scale.
For illustration only, if your agreed rate were $200 + GST per hour and ten extra hours were authorised, the additional consultant fee would be $2,000 + GST. This is arithmetic using a hypothetical rate, not a market price reference.
Keep these costs separate
- Your planner: advice, reporting and application support within the engagement.
- The authority: pre-application, lodgement, processing, review and monitoring charges as applicable.
- Other consultants: architectural design, survey, civil, geotechnical, traffic, landscape and other specialist work.
- Later stages: building consent design, engineering approvals, legal and title work, construction and condition compliance.
Auckland Council explains that additional processing costs may be invoiced when actual charges exceed the deposit. A council deposit therefore should not be treated as a cap on the total approval cost or as payment for your private planner.
What makes a planning fee increase?
- More significant planning departures, difficult effects or several approval pathways
- Complex subdivision, natural hazards or other site constraints
- Missing information and inconsistent specialist reports or drawing revisions
- Changes to the project after the planning assessment is prepared
- Additional meetings, information requests, consultation or notification-related work
Ask for relevant local experience, who will actually carry out the work and how senior review is charged. Clear assumptions and coordination matter as much as the starting fee.
Using Buildara’s calculators
The Building Cost Calculator currently has a Resource consent allowance but no dedicated planner fee field. Check what your overall RC budget includes before adding the planner, council and specialist costs. Do not assume that a single allowance covers all three.
In the Project Margin Calculator, record the planner’s fee within Professional fees per lot, with authority charges in the appropriate council-cost breakdown. These breakdowns form part of the total subdivision allowance; they are not added on top of the same total again. Convert whole-project quotes to per-lot amounts consistently and follow the ex-GST input basis.
Related guides: Survey · Civil engineering · Geotechnical · Traffic · Landscape design.
Questions before accepting a planner’s quote
- Does it cover feasibility, AEE only, lodgement, or support through a decision?
- Which planning provisions, consent types and design version does the quote assume?
- Which specialist reports and drawings must I obtain separately?
- Are meetings, written-approval coordination, RFIs and condition review included?
- What triggers extra charges, and will you obtain instructions before exceeding the budget?
- Are council fees, GST, travel and disbursements included or excluded?
Sources and limitations
- Planr — Planner roles and indicative fees, 5 October 2026
- Planning Plus — Older AEE and related planning fee example
- Ministry for the Environment — Resource consent process
- Auckland Council — Processing fees and deposits
For preliminary budgeting and scoping only. Planning provisions and approval requirements can change; confirm those applying to your site and application date. Obtain a current written engagement from an appropriately experienced planning consultant.
Common questions
Is a planner’s fee the total resource consent cost?
No. Authority processing charges, architectural design and specialist reports need to be checked separately.
Does a fixed planner fee include every further-information response?
Not automatically. Confirm response rounds, design revisions, extra-work rates and the end point of the engagement.
Does a planner prepare architectural drawings?
Do not assume so. A planner provides planning advice and the application’s planning case; architectural drawings usually come from an architectural designer or architect.
