Start with a plan, or estimate manually
Upload a PDF or image to calibrate and measure, or enter a project quantity directly for a quick estimate.
⚡ Length mode: click multiple points → double-click to confirm a segment | Area mode: click outline points → double-click to close
Measurements
📍 Confirmed length records
- No measurements
📐 Confirmed area records
- No area measurements
📦 Materials estimate
No plan uploaded? Enter the project quantity or area manually below.
More project settings
Current project length/area: 0
Items added: 0
| Project item / quantity | Material quantity | Unit | Material/work | Rate (NZD) | Subtotal (NZD) | |
|---|---|---|---|---|---|---|
| No materials yet | ||||||
| Materials subtotal | $0 | |||||
| Labour subtotal | $0 | |||||
| Plant/transport subtotal | $0 | |||||
| GST adjustment | $0 | |||||
| Quote allowance | $0 | |||||
| Contingency | $0 | |||||
| Clearly ex-GST rates are adjusted by the mode above; GST status for other rates is shown in the source notes. | ||||||
| 📦 Total | $0 | |||||